Methodology ACM0013: “Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology.”
Request on 18 March 2010.
Response on 21 April 2010.
Methodology ACM0013: “Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology.”
Request on 18 March 2010.
Response on 21 April 2010.
The Article 6.4 Supervisory Body aims to adopt the sustainable development (SD) tool at its next meeting in September/October. This tool is the main instrument
Maintaining the incentive to decarbonise should be the guiding principle of the UK ETS, ensuring covered emissions go to zero or near zero. The integration
Carbon Market Watch gives specific feedback to rules considering a Monitoring, Reporting, and Verification (MRV) system for non-CO2 aviation effects, and deplores the serious weakening
Stay in touch and receive our monthly newsletter, campaign updates, event invites and more.